For Sale — Reserve Now with Deposit

Build 001

For Sale on Completion — VW Transporter T6.1 Off-Grid Conversion

Price £49,950
Base Vehicle VW Transporter T6.1
Year 2023
Colour Pure Grey
Status For sale on completion
Reserve Deposit secures
01

Phase One — Complete

The Base Vehicle

Every ZomB build starts with the right base. Build 001 begins with a 2023 VW Transporter T6.1 in Pure Grey — a panel van with a clean history and a blank cargo area. The T6.1 is the right choice for this brief. Understated on the road. Solid mechanicals. Enough space to build something serious without tipping into Transit territory. It arrived ply-lined from previous use, at our workshop in rural Derbyshire. The first job was stripping everything back — all fittings, lining and seats out. No shortcuts, no building over someone else's work.

2023 VW Transporter T6.1 in Pure Grey — ZomB Build 001 base vehicle

Build 001 base vehicle — 2023 VW Transporter T6.1, Pure Grey

02

Phase Two — Complete

Strip Out

The van arrived with a full ply lining from its previous life. Before anything goes in, everything comes out. Ply panels, floor covering, front seats, all trim. Down to bare steel. It takes longer than people expect. Done properly, it means every decision made from here is intentional — nothing inherited, nothing hidden.

VW Transporter T6.1 interior with original ply lining — before strip out VW Transporter T6.1 ply lining removal in progress — ZomB Build 001

Before and during — ply lining removal

VW Transporter T6.1 stripped back — panels removed, ZomB Build 001 VW Transporter T6.1 fully stripped of all fittings and lining — ZomB Build 001

Front seats out, all fittings and lining removed — ready for the build

03

Phase Three — Complete

Apertures, Windows & Swivel Seat

Before any insulation goes in, the shell needs to be finalised. That means cutting apertures and fitting windows — a precise, irreversible process that has to be right first time. Window placement affects light, ventilation, privacy and the overall look of the finished van. Each position is carefully considered before a blade goes anywhere near the metalwork. At the same time, a swivel base is fitted to the passenger seat — a small detail that transforms how the interior works, turning the front cab into part of the living space when parked.

ZomB Build 001 — fitted side window and passenger seat swivel base on a 2023 VW Transporter T6.1

Side window fitted, passenger swivel base in place

04

Phase Four — Complete

Pop Top & Diesel Heater

Two of the most significant upgrades to the base vehicle. The pop top roof transforms the interior — standing height when parked, a low profile on the road. The diesel heater is the backbone of the off-grid heating system — reliable, efficient, independent of shore power. Both are fitted before the interior build begins so everything else is designed around them.

ZomB Build 001 — 2023 VW Transporter T6.1 with pop top roof fitted

Side profile with pop top and full window set fitted

ZomB Build 001 — pop top roof close up

Pop top installation — clean, factory-quality finish

05

Phase Five — In Progress

First Fix Electrics

With the shell finalised, first fix electrics go in before insulation covers everything up. Cable runs, solar entry gland and charging points are all mapped and installed at this stage. Getting this right means no chasing cables through finished walls later. Build 001 uses a Bluetti solar generator rather than a conventional fixed lithium install — meaning the entire power system can be removed from the van and used independently. Base camp power, remote working, emergency backup. The van charges it via the roof solar array; unplug and take it with you.

06

Phase Six — Next

Sound Deadening & Insulation

With all penetrations made and first fix complete, the shell is ready to be sealed up. Sound deadening throughout, then full insulation — floor, walls, ceiling. Done properly this is what separates a serious build from a weekend project. The thermal and acoustic performance of a ZomB van is built in at this stage, not bolted on later.

ZomB Build 001 — interior with ceiling lining, spot lights and pop top gas struts visible

Interior view showing carpet lining, ceiling spots and pop top mechanism (preview of finished feel)

07

Phase Seven — In the Workshop

Interior Fit-Out

Build 001 is fitted with a quality interior — cabinetry, sleeping platform and living space — designed around the family brief and the off-grid capability spec. The interior components are prepared in the workshop and installed into the van once the shell is fully lined. A considered, functional layout rather than an afterthought.

08

Phase Eight — Upcoming

Water System

A simple, honest water system. A compact sink with fresh and grey water tanks housed neatly underneath. Easy to refill, easy to drain, easy to live with. No overengineering.

09

Phase Nine — Upcoming

Second Fix Electrics & Finishing

With furniture in place, second fix electrics connect everything up. Lighting, USB and 12v outlets, 240v sockets, Bluetti integration points and any ancillary systems are all terminated and tested. Finishing details — edge trims, surface finishes, hardware — are fitted at this stage. The difference between a van that's been built and a van that's been finished.

10

Phase Ten — Upcoming

Final Fit Out & Handover

The final phase. Every system is tested, every surface inspected. The customer is walked through the van before it leaves the workshop. Build 001 leaves as a complete, capable, ready-to-go ZomB.

Full Specification

What's Included

Base Vehicle

  • 2023 VW Transporter T6.1
  • Pure Grey factory paint
  • Diesel manual
  • Full service history

Living Space

  • Pop top roof — standing height when parked
  • Sleeping for family group
  • Passenger seat swivel base
  • Side and rear windows fitted

Power & Heating

  • Bluetti solar generator — fully removable
  • Roof-mounted solar array
  • Diesel heater — independent of shore power
  • 12v and 240v throughout
  • USB charging points

Off-Grid Systems

  • Compact sink with fresh & grey water tanks
  • Full insulation — floor, walls, ceiling
  • Sound deadening throughout
?

Common Questions

FAQ

Can I reserve this van before it's finished?

Yes. A deposit secures Build 001 ahead of completion. The remaining balance is payable on handover. Get in touch to discuss.

Can I view the van during the build?

Absolutely. Viewings are by appointment at our workshop in rural Derbyshire. Seeing a build in progress is the best way to understand the quality of the work.

Is the price negotiable?

The price reflects the spec and the work involved. We don't generally negotiate on price, but we're happy to discuss spec changes or upgrades that affect the final cost.

Can I customise the build?

Build 001 is being built to a defined spec, but reasonable customisation requests can be discussed if reserved early in the build.

Why a Bluetti rather than a fixed lithium battery?

The Bluetti solar generator is fully removable, meaning the entire power system can leave the van and be used independently — base camp power, remote working, emergency backup. The van charges it via the roof solar array.

What's the expected completion date?

Get in touch for the latest timeline — we'll give you an honest update based on where the build currently is.

Is delivery available?

Delivery may be available. Costs depend on distance from Derbyshire — we'll discuss this when you reserve.

Build Status

Base vehicle acquired Complete
Full strip out — all fittings and lining removed Complete
Apertures, windows & swivel seat Complete
Pop top roof & diesel heater installation Complete
First fix electrics — cable runs, solar entry, Bluetti charging points In progress
Sound deadening & insulation Upcoming
Interior fit-out Upcoming
Water system Upcoming
Interior fit-out Upcoming
Water system Upcoming
Second fix electrics & finishing Upcoming
Final fit out & handover Upcoming

Reserve Build 001.

£49,950 — for sale on completion. Deposit secures the build. Get in touch to arrange a viewing or discuss reserving.

Enquire about this build